The rehabilitation work on I-680 in Contra Costa County addressed the seismic vulnerabilities on the existing southbound Mococo Overhead superstructure, removal and replacement of the existing southbound Marina Vista off-ramp structure, and construction of an emergency access lane from the southbound lanes of the Benicia Martinez Bridge onto lanes of the northbound Mococo structure. Work on the project, located in an environmentally sensitive wetland, was limited to a single construction season consisting of 177 working days. Due to the environment of the project, a temporary wetland protection system was implemented.
Extend the lifespan and durability of any concrete. PoreShield is a USDA BioPreferred product and is approved for residential, commercial, and industrial use. It works great above...
The concrete at the Indiana State Fairgrounds & Event Center is subject to several potential sources of damage including livestock biowaste, food/beverage waste, and freeze/thaw...
PoreShield is a cost-effective, nontoxic alternative to traditional concrete sealers. It works differently, absorbing deep into the concrete pores to block damage from salt ions...