No. 10 - Beach Road over Lagoon Pond Bridge Replacement

Jan. 1, 2016

The Lagoon Pond drawbridge carries the two-lane Beach Road, a critical part of the road network on the island of Martha’s Vineyard, Mass. Deemed structurally deficient, the wood pilings sat on an unstable layer of peat and could not be reinforced any further. Two phases of the bridge replacement included construction of a pre-engineered temporary bridge and demolition of the existing bridge followed by the construction of the permanent bridge. Access to the project site was restricted to ferry boats or barges. Additionally, the team had to overcome complications due to the close proximity of the construction site to the temporary bridge.

Location: Oak Bluffs/Tisbury, Mass.

Cost: $41 million

Length: 350 ft

Designer: Parsons

Contractor: The Middlesex Corp.

Owner: Massachusetts Department of Transportation

Sponsored Recommendations

The Science Behind Sustainable Concrete Sealing Solutions

Extend the lifespan and durability of any concrete. PoreShield is a USDA BioPreferred product and is approved for residential, commercial, and industrial use. It works great above...

Champion Flame Shield® Phenolic Conduit Guide

Learn how Champion Flame Shield® Provides a Safe Solution in Fire Sensitive Applications

Electrical Conduit Comparison Chart

See how fiberglass conduit stacks up to the competition in crucial areas like weight, corrosion resistance and installation cost.

Proven Concrete Protection That’s Safe & Sustainable

Real-life DOT field tests and university researchers have found that PoreShieldTM lasts for 10+ years and extends the life of concrete.