I-40 Meteor City Road Bridge Replacement outside Winslow, Arizona

Oct. 29, 2019

This accelerated bridge build in the Arizona desert replaces a pair of structurally deficient spans originally built in the 1960s. Our thanks to the Arizona DOT for contributing this video. Enjoy!

This accelerated bridge build in the Arizona desert replaces a pair of structurally deficient spans originally built in the 1960s. Our thanks to the Arizona DOT for contributing this video. Enjoy!

Sponsored Recommendations

The Science Behind Sustainable Concrete Sealing Solutions

Extend the lifespan and durability of any concrete. PoreShield is a USDA BioPreferred product and is approved for residential, commercial, and industrial use. It works great above...

Champion Flame Shield® Phenolic Conduit Guide

Learn how Champion Flame Shield® Provides a Safe Solution in Fire Sensitive Applications

Electrical Conduit Comparison Chart

See how fiberglass conduit stacks up to the competition in crucial areas like weight, corrosion resistance and installation cost.

Proven Concrete Protection That’s Safe & Sustainable

Real-life DOT field tests and university researchers have found that PoreShieldTM lasts for 10+ years and extends the life of concrete.