Fast Cycling for Cost-Effective Bridge Construction

Feb. 8, 2022

PERI VARIOKIT Balanced Cantilever Carriage provided the optimal customized and rentable solution for the 1,250-foot viaduct as part of a 40-mile motorway connecting Kičevo and Podvis, North Macedonia.

PERI VARIOKIT Balanced Cantilever Carriage provided the optimal customized and rentable solution for the 1,250-foot viaduct as part of a 40-mile motorway connecting Kičevo and Podvis, North Macedonia.

Editor's Note: Scranton Gillette Communications and the SGC Infrastructure Group are not liable for the accuracy, efficacy and validity of the claims made in this piece. The views expressed in this content do not reflect the position of the Roads & Bridges' Editorial Team.

Sponsored Recommendations

Champion Flame Shield® Phenolic Conduit Guide

Learn how Champion Flame Shield® Provides a Safe Solution in Fire Sensitive Applications

Electrical Conduit Comparison Chart

See how fiberglass conduit stacks up to the competition in crucial areas like weight, corrosion resistance and installation cost.

Tuscarora Tunnel Rehabilitation Project

Read how Champion Fiberglass conduit provided a safe, 2-hour rated solution in the Tuscarora Tunnel along the Pennsylvania Turnpike.

Electrical Conduit for Bridge Projects Guide

Bridge construction projects are loaded with details and electrical conduit is a key component. Lightweight Champion Fiberglass offers lower materials and installation costs. ...