Delivering Efficiency
Developing a solution for bridge decks on steel girders led the engineering team to select PERI’s VARIOKIT system with GT 24 Girders to support the deck with large bracket spacing. PERI’s engineered solution delivered an efficient and lean system, striking a balance between hanger capacity, bracket spacing, and hanger rod loading to provide the optimal system.
In addition to being efficient in operation, the crew could preassemble all equipment on the ground, reducing crew time in the air and making the site safer.
VARIOKIT offers standardized components for a wide range of civil engineering that can be combined with PERI formwork for a customized, economical bridge formwork solution. With fitting pin connections and simple adaptation spindles, operations are accelerated, and assembly time is minimized. VARIOKIT is highly efficient due to rentable components and statically optimized planning processes.
GT 24 girders are versatile lattice girders with high load-bearing capacity and rigidity, therefore reducing material usage and workload. They also provide an option that reduces the need to buy and later dispose of dimensional lumber. The girders are compatible with other PERI products and feature latticework construction, allowing for easy connection of site accessories.
Beyond formwork solutions, PERI USA provided engineering support and a site tech to the project team to ensure the system was implemented properly and performed in the most efficient manner.
All Aboard
After six months of construction, bridges 6 and 8 opened in the spring of 2022. Bridge 22 opened in the fall of 2022.