Solution
Oldcastle Infrastructure provided the precast products for a three-sided bridge that offered the perfect solution for UDOT to create a large, open underpass crossing in a remote part of the state to allow elk to continue migrating safely past US-191.
To create the “clamshell” of the bridge, Oldcastle Infrastructure delivered 14 26’x8’ three-sided bridge units that, when combined, created a 26’x16’ unit measuring 54 feet in length.
Installation was detail-oriented and precise: first, a diversion around the highway was constructed to allow traffic to continue to travel; following this, the contractor began excavation. Despite logistical limitations due to drive-time restrictions and travel distance, installation of the three-sided bridge took just two days. The bottom seven units were set in one day, with the top units completed the following day.
Finally, the highway was reconstructed after the bridge was installed. The result? A good-looking, innovative, ecological solution that met the needs of UDOT, and the elk.
Benefits
A three-sided bridge was the perfect product to design a system for such a project. It met the customer’s need for a highly constructible, precast solution, and satisfied the innovative planning, design, materials, and construction requirement within Accelerated Bridge Construction (ABC).
Why precast? There are many advantages and ways that choosing precast can enhance a project. Among them: Improved site constructability; expedited total product delivery time; enhanced work-zone safety for the traveling public; reduced traffic impact; shorter onsite construction time; and less weather-related time delays.