BGFMA

North Baltimore, OH

COMPANY OVERVIEW

About BGFMA

Contact

300 East Cherry Street
North Baltimore, OH
http://www.bgfma.org
877.257.5499

More Info on BGFMA

BGFMA…this next generation Bridge Grid Flooring Manufacturers Association industry group is comprised of companies who fabricate steel grid deck systems for bridges and other companies with an interest in this market. Building on the near-100-year service history of filled grid systems, this expanded professional organization is focused on the reliable development and application of open grid, grid reinforced concrete, and Exodermic® bridge decks to meet the demands of the engineering community and traveling public.

BGFMA Mission

Steel grid bridge decks are time-tested, economical solutions for new or rehabilitated structures. The role of BGFMA is to promote the use of these decks through data collection, research/development and education. BGFMA will focus its efforts on demonstrating to owners and engineers the following advantages of steel grid bridge deck systems:

  • Lightweight
  • Quick/Efficient Installation
  • Long-Term Performance
  • Lower Life-Cycle Cost

Case Studies

Patapsco 1
Bridge Construction

I-895 over Patapsco River Flats in Maryland gets ultra-light bridge deck

Oct. 5, 2018
A partially filled concrete grid bridge deck was selected as a major component of the solution for the lightweight superstructure replacement on I-895 over Patapsco River Flats...
Picture 1_0
Bridges

Special deck makes history on Liberty Bridge in Pennsylvania

Oct. 4, 2017
The Liberty Bridge over the Monongahela River opened for traffic in 1928 and is credited (along with the Liberty Tunnel) as an instrumental door opening Pittsburgh’s yet undeveloped...
IMG_1073
Bridges

New York Expressway/Dyer Avenue Bridge re-decking presents unique challenges

Oct. 6, 2016
All roadway and bridge construction or rehabilitation performed within New York City has the potential to create a traffic gridlock nightmare. This is especially true when the...
I-81 panel setting
Bridges

Use of precast grid deck supports staged construction and accelerates superstructure replacement

Oct. 23, 2015
Interstate 81 is a vital trucking route along the Appalachian corridor and in particular, south central Pennsylvania. Years of heavy traffic and the harsh Northeast weather abused...
Photo 1 - Precast deck panels in place
Structural Strengthening

Georgia DOT uses precast deck panels to accelerate rehabilitation of I-20 Bridges

Oct. 24, 2014
The Georgia Department of Transportation maintains a network of roads and bridges that carry some of the highest traffic volumes in the country, and often employs accelerated ...
Walt Whitman (main)
Bridges

Walt Whitman Bridge receives new steel grid deck system

Oct. 25, 2013
Designed by renowned civil engineer Othmar Ammann and constructed by American Bridge Co., the Walt Whitman Bridge was first opened to traffic in 1957 and utilized a concrete-filled...
Image1
Bridges

Overnight redecking of the Grand Island Bridges

Oct. 19, 2012
The Grand Island Bridges carry I-190 over the Niagara River between Tonawanda, Grand Island and Niagara Falls, N.Y. The two sets of twin truss arch bridges were opened in 1935...