The city of Windsor, Ontario, Canada faced challenges of steep proportions in both preventing sediment erosion and establishing turf growth on 11 acres of 2:1 gradient exit ramp embankments. The exit ramps were built to provide motorists with a quicker route into the city, connecting Six Concession Road with Dougall Parkway, a main thoroughfare that turns into Highway 401.