Couched in the heart of the greater Toronto area lies York Region, a 678-sq-mile stretch that is home to some 1.1 million souls.

There since 2005 the York Region Rapid Transit Corp. (YRRTC) has been engaged in the multi-phase vivaNext Rapid Transit Network project, one significant portion of which stands at No. 2 on the 2015 Roads & Bridges Top 10 Roads list.

A multimodal complete street throughway, the $287 million (CAN) Highway East 7 Rapidway segment now boasts 10 bus rapid transit (BRT) stations at key intersections, nine of which are center-lane. The stations are comprised of steel half-arch frames supporting blue-glass panels cantilevered over waiting areas and passenger platforms. In an effort to create an iconic look that also bore an historic air, designers borrowed from European examples, notably with the 88.6-ft-long glass canopies, which include heated enclosures. 

The BRT line features transit-signal priority, facilitated by radio and infrared receivers along with loop detectors in the roadway itself that can detect both cars and bicycles waiting at intersections. Variable message signs at each platform offer scheduling and arrival information, sourced from on-board GPS.

The physical makeup of the BRT lanes was a particular point of concern for designers, according to Kathryn Webber of YRRTC, who told Roads & Bridges that the Transportation Association of Canada designated red as the color for all BRT lanes. “The design of the red asphalt provided an opportunity to construct a mix that was durable considering [both] traffic movements and Ontario’s variable climate,” said Webber.

The final “look” of the mix was achieved via the inclusion of red aggregates introduced into polymer-modified black asphalt cement (PG 70-28), along with the addition of a specially engineered red pigment. In an effort to supply sustainable infrastructure, 4.6-ft-wide bike lanes were installed with a 1.6-ft buffer zone between bike and vehicle traffic. These lanes were discriminated from ordinary traffic lanes by a high-contrast green paint. Moreover, curb-inset bike boxes were installed at intersections to trigger traffic signals via in-pavement detection loops, allowing bicyclists to turn left without crossing traffic in the left-turn lane. 

Wider sidewalks were laid down and traffic speed limits were reduced from 50 mph to 37 mph. Landscaping along the outer edges of the sidewalks also provides a buffer between pedestrians and vehicle traffic.

Results were realized with relative speed, once the corridor opened: a 35% reduction in BRT travel times and a 10% increase in ridership. Moreover, bike traffic increased more than tenfold. R&B

Project:
vivaNext Highway 7 East Rapidway

Location:
Highway 7 East, town of Richmond and city of Markham, Ontario, Canada

Owner: The Regional Municipality of York

Designers: Delcan; AECOM; IBI Group

Contractor:
Kiewit EllisDon (KED), a partnership

Cost: $287 million (CAN)

length: 3.73 miles

Completion Date: Sept. 9, 2014

About The Author: Budzynski is managing editor of Roads & Bridges

Sponsored Recommendations

The Science Behind Sustainable Concrete Sealing Solutions

Extend the lifespan and durability of any concrete. PoreShield is a USDA BioPreferred product and is approved for residential, commercial, and industrial use. It works great above...

Proven Concrete Protection That’s Safe & Sustainable

Real-life DOT field tests and university researchers have found that PoreShieldTM lasts for 10+ years and extends the life of concrete.

Revolutionizing Concrete Protection - A Sustainable Solution for Lasting Durability

The concrete at the Indiana State Fairgrounds & Event Center is subject to several potential sources of damage including livestock biowaste, food/beverage waste, and freeze/thaw...

The Future of Concrete Preservation

PoreShield is a cost-effective, nontoxic alternative to traditional concrete sealers. It works differently, absorbing deep into the concrete pores to block damage from salt ions...