This project sought to improve roadway conditions through the improvement of the existing roadway geometry, signalization at ramp intersections, construction of turning lanes at ramp intersections, widening and realignment of ramps, pavement and bridge reconstruction.
Location: York County, Pa.
Cost: $57.9 million
Length: 1.77 miles
Designer: Gannett Fleming Inc.
Owner: Pennsylvania DOT, District 8-0
Contractor: Kinsley Construction Inc.