There will be closures in place today and tomorrow
The Michigan Department of Transportation (MDOT) is rebuilding the section of freeway between Interstates 96 and 496. Work began last spring and will continue into early December. It will pick up again in 2025.
The exit ramp at the U.S. Route 127/Interstate 496 interchange will be closed from today at 10 a.m. through tomorrow until 4 p.m. for bridge demolition. It is part of the $205 million rebuild of U.S. Route 127.
The current phase of the project has all traffic shifted to the southbound lane while the northbound lanes are being rebuilt. That will be reversed next year.
Once that section is done, MDOT will turn its attention further north to the stretch between Interstate 496 and Interstate 69.
The project is set to rebuild 3.7 miles of U.S. Highway 127 and Interstate 496, while improving and replacing bridges along each corridor. Work will take place through both Clinton and Ingham counties via several phases of work from 2022 through 2028.
Extend the lifespan and durability of any concrete. PoreShield is a USDA BioPreferred product and is approved for residential, commercial, and industrial use. It works great above...
The concrete at the Indiana State Fairgrounds & Event Center is subject to several potential sources of damage including livestock biowaste, food/beverage waste, and freeze/thaw...
PoreShield is a cost-effective, nontoxic alternative to traditional concrete sealers. It works differently, absorbing deep into the concrete pores to block damage from salt ions...