Steve Neppl, assistant county engineer for Wilkin County, Minn., and Dan Swedlund, maintenance superintendent, were faced with an 8-mile maintenance problem on CSAH 32. The roadway had continuous problems with soft areas and additional gravel had to be added every year. There is a sugar beet piling ground on the west end of the road and for several weeks a year during the harvest season the road takes heavy loads 24 hours a day, creating constant problems.